PRANTH
Dholera Special Investment Region (SIR) is India's premier industrial smart city node within the DMIC corridor. Key facts: 920 sq km master plan, home to Tata Electronics semiconductor fab (2026), 4000m international airport runway, and 5000 MW solar park. Strategic for high-yield industrial and residential land investments.
India's First Imperial Smart City

DHOLERA SIR

The Global Hub of the New Era.

₹91k Cr
Tata Electronics
50k+
New Jobs
Live
Early 2026
920
Sq Km Area
The Vision

India's Next Chapter

Dholera Semiconductor Hub

INDIA'S NEXT CHAPTER

Semiconductor
Revolution

Home to India's first semiconductor fab by Tata Electronics. Construction is advanced, with commercial chip production targeted for late 2026. This high-value manufacturing is supported by the ABCD Command Centre.

Dholera Solar Park

SUSTAINABLE FUTURE

Green Energy
Hub

Powered by a massive 5000 MW solar park, with over 1.2 GW already operational, making Dholera a net-positive sustainable city.

Dholera International Airport

GLOBAL LOGISTICS

Aviation
Gateway

Featuring a 4,000m Code-4E runway, Dholera International Airport is engineered to be the primary logistical engine for North-Western India by 2026.

Smart City Brain - ABCD Building

DIGITAL TWIN

Aura OS &
ICCC Center

A sentient city managed by the Integrated Command & Control Center (ICCC), utilizing real-time ICT to orchestrate seamless urban living.

Dholera Connectivity Expressway

MULTIMODAL HUB

6-Lane Expressway
& HSR Link

Seamlessly linked via high-speed rail and prime expressways, ensuring sub-45 minute connectivity to major industrial and commercial hubs.

The Dholera Advantage

What Sets Us Apart

Worldclass Infrastructure

Benchmarked against global smart cities.

Ease of Governance

Single window clearance and empowered authority.

Plug & Play

Ready-to-use utility connections for industries.

Social Infrastructure

Integrated healthcare, education and recreation.

Ease of Business

Simplified policies to accelerate investment.

External Connectivity

Land, Sea, and Air linkages to global markets.

Live, Work and Play

A balanced ecosystem for holistic living.

Technology

Smart grid, ICT, and sensor-based management.

Sustainability

Zero liquid discharge and green energy focus.

Fast Track Approvals

Time-bound allotmnent and permitting.

Security

Integrated command and control center (ICCC).

Internal Connectivity

Wide arterial roads with dedicated utility corridors.

The Reality

Project Status Live

Ground reality of the 22.5 Sq. Km Activation Area.

FULLY OPERATIONAL
LAST VERIFIED: JULY 28, 2026
LATEST INTELLIGENCE: JUNE 2026

First aircraft landed at Dholera International Airport (June 5) — airport now 80% complete, operations targeted for Sept–Oct 2026.

VIEW DETAILS
Dholera SIR Activation Area
CORE INFRASTRUCTURE

Activation Area

The heart of Dholera SIR. 22.5 Sq Km of fully developed land with plug-and-play utilities, an underground utility corridor carrying water, gas and ICT, and a 6.5 km canal front — ready for immediate industrial allotment.

100% Completion
22.5 Sq Km Ready

Road Network

72 km of internal roads complete. The 109 km Ahmedabad–Dholera Expressway (NE-8) was inaugurated in March 2026.

72km INTERNAL COMPLETE
Expressway Open · 45 Min

Water Treatment

Potable supply via mass balancing reservoirs and ESRs, with smart metering.

50MLD Scalable to 150

Power Supply

400/220 kV gas-insulated, SCADA-enabled substation by Torrent Power.

500MVA Scalable to 1500

ICT Network

City Integrated Operations Center (CIOC).

CIOC Operational

Sewage Treatment

Dedicated STP serving the activation area.

10MLD Scalable to 30

Effluent Treatment

Common Effluent Treatment Plant (CETP) for industrial discharge.

20MLD Scalable to 60

A Global Manufacturing Hub

India's First Imperial Smart City. The Global Hub of the New Era.
Flagship Estate

The Forest Ville

Experience the zenith of Dholera living. A plug-and-play luxury villa community nestled in nature, just moments from the international airport.

  • 800m from Dholera Expressway
  • Near Tata Semiconductor Plant
  • Adjacent to Blackbuck National Park
EXPLORE RESIDENCES
The Forest Ville - Luxury Residences
Download Vision Brochure
The Road Ahead

Future & Milestones

Key developments scheduled for 2026-2027.

JUNE 5, 2026

First Aircraft Lands

The Airports Authority of India carried out the first successful trial landing at Dholera International Airport, validating the runway ahead of commercial operations.

JULY 2026

Airport 80% Complete

Runway, taxiways and the ATC tower are finished and the passenger terminal is at 75%. Operations are targeted for September–October 2026.

RAIL LINK

₹20,667 Cr Sanctioned

The Central Cabinet has sanctioned ₹20,667 Cr for the Dholera–Ahmedabad rail line, accelerating multi-modal logistics for the 22.5 sq km activation area.

LATE 2026

Semiconductor Production

Tata Electronics Fab remains on track to commence commercial production of India's first home-grown chips, marking a historic shift.

Witness the Scale of Dholera

Experience the infrastructure firsthand. Guided tours available for investors.

Schedule a Site Visit
Financial Foresight

Investment Growth

Visualize the potential appreciation of your Dholera land asset. Based on historical trends of smart city developments.

5 Years
38%
Simulate growth scenarios during Dholera's key phases.
Projected Value

₹0

Total Gain +₹0
The Master Blueprint

Strategic Grandeur.

920 Sq. Km of Managed Excellence.

TP 1

The Residential & Commercial Core of Dholera.

ZONING Mixed-Use High Density
UTILITIES 100% Plug & Play
RELIABILITY 24/7 Water & Power
ACCESS Expressway Linked
ACTIVATION STATUS FULLY OPERATIONAL

TP 2

The Industrial Powerhouse of the DMIC.

LOGISTICS Multi-Modal Hub
ENVIRONMENT Zero-Liquid Discharge
ENERGY SOURCE 5GW Solar Park
ZONING Large Scale Industry
SECURE INDUSTRIAL PLOT
Global Benchmarking

Alpha Comparison Matrix

KEY METRIC DHOLERA SIR (INDIA) SHENZHEN (CHINA) JURONG (SINGAPORE)
Total Planned Area Economic development scale. 920 Sq. Km 2,050 Sq. Km 30 Sq. Km
Cargo Capability Runway and logistical capacity. Code 4E (4,000m) Full International Hub Global Port/Air Link
Infrastructure Age Technology integration level. Greenfield (Latest ICT) Brownfield Evolution Mature Ecosystem
Green Energy Support Renewable energy park. 5,000 MW Solar Mixed Grid High Efficiency Grid
Investment Phase Growth potential & entry cost. ALPHA ENTRY (HIGH GROWTH) MATURE (STABLE) SATURATED (STABLE)
Regulatory Intelligence

Technical Specifications

Direct data points for institutional and industrial investors in Dholera DSIR.

TP 1: Residential & Mixed-Use

Max FSI (Floor Space Index) Up to 5.0 (Zone Dependent)
Min Ground Coverage 25% - 40%
Max Building Height Subject to Airport AOC
Utility Infrastructure Plug & Play (SCADA Managed)

TP 2: Industrial Powerhouse

Industrial FSI 1.0 to 1.8 (Base)
Min Plot Size (Industrial) 1,000 Sq. M to 500+ Acres
Effluent Discharge Zero Liquid Discharge (ZLD)
Power Reliability N+1 Redundancy (SCADA)
Official DSIR Master Plan (GIDC) Official regulatory framework and zoning maps.
ACCESS OFFICIAL DATA

Secure Your Place in India's Future

Development Timeline

Partner with the Future

Whether you are a global manufacturer or a strategic investor, Dholera offers unparalleled opportunities. Join the semiconductor revolution today.

Start the Conversation